skip to main content
Logo

Contact

Staff

Prospectus

PTA

About the School

The current buildings for Hardwick Community Primary School were built in 1978, with an extension added in the early 1990s. We have excellent facilities, including a attractive playing field, a large hall with a stage, a well-equipped gymnasium and two computer suites. All classrooms are equipped with interactive whiteboards.

 

Our School Values

 

OFSTED

The school was last inspected in Autumn 2006 and the inspectors found many things to praise. Every aspect of the school was judged to be at least good, (which in OFSTED terms means "above average" ) very good, or outstanding. We were thrilled that the inspection team recognised the very many strengths of the school.

Follow the link here for the report.

OFSTED REPORT NOV 2006

 

 


Customer support: site / email | ©2000-2009 DB Education Services Ltd | about us | terms & conditions
DB requires modern browsers with JavaScript enabled. Some areas are enhanced with Flash
v2.6.0 3 served by w009 at Sat Nov 07 11:11:26 GMT 2009